Major Road Projects Victoria (MRPV) Lathams Road Upgrade

Lathams Road Upgrade

The Lathams Road Upgrade project involved a 2.5km duplication and widening of Lathams Road from two lanes to four lanes between Oliphant Way and Frankston-Dandenong Road, including a new bridge over the Mornington Peninsula Freeway and widening and tie-in to the Eastlink entry and exit ramps to Oliphant Way. The road is a main arterial for commercial and public transport connection from the industrial hub in Dandenong to the Peninsula. Construction of the bridge increased vehicle access lanes to and from the Peninsula Link Toll-Way to reduce commute times and traffic congestion.

Home Case Studies Lathams Road Upgrade
Lathams Road Case Studies | Trafman Solutions

The Challenge

Managing Traffic, Safety, and Service Interference During a Major Arterial Road Upgrade

The Lathams Road Upgrade presented significant challenges due to the scale and complexity of duplicating and widening a major 2.5km arterial road while maintaining continuous traffic flow for commercial transport, public commuters, and surrounding industrial operators.

The project required careful coordination of traffic control, pedestrian management, and service identification to keep crews safe in a high-risk environment. Complex factors such as working around existing underground utilities, managing No-Go Zones, facilitating bridge beam lifts, and providing precise temporary traffic solutions during constantly changing road layouts added to the operational difficulty. Ensuring minimal disruption, maintaining safety, and delivering accurate service clearances were critical obstacles that required a highly coordinated, multi-disciplinary approach.

Solutions

See How Our Solutions Work

Trafman Solutions delivered a coordinated, multi-disciplinary approach that addressed the project’s traffic, safety, and infrastructure challenges with precision. Through detailed assessment, strategic planning, efficient on-site execution, and close collaboration with all project stakeholders, we ensured the Lathams Road Upgrade progressed safely, smoothly, and in alignment with construction timelines.

  • Discovery

    Before works commenced, Trafman Solutions conducted a thorough assessment of the project’s traffic, pedestrian, and service-related risks. Our teams identified critical underground and overhead utilities, surveyed access points, and analysed projected traffic flow changes required during each construction phase.

    Early engagement with surveyors, engineers, and site managers ensured we understood the complexities of widening the road, upgrading the bridge, and maintaining safe access to the high-volume industrial and commercial precinct surrounding the corridor.

  • Solution Design

    We developed a tailored traffic and safety plan designed to minimise disruption while maintaining maximum protection for workers and road users.

    This included strategic placement of traffic controllers, temporary devices, and staged signage to support shifting construction boundaries.

    Our NDD (Non-Destructive Digging) and Spotter teams created a service-exposure strategy that supported clear design planning and avoided asset strikes.

    Saw and Core operations were sequenced to provide surveyors with the access they required for accurate soil testing and structural inspections.

  • Implementation

    Steps or phases of execution (timeline, tools, techniques, or creative direction). Execution involved a disciplined, multi-phase rollout:

    • Survey & Establishment: Traffic and pedestrian management setups enabled safe surveying and early works.
    • Service Exposure & Excavation: NDD teams exposed underground assets, cleared crossovers, and managed dewatering where required.
    • Construction Support: Saw and Core operations cut concrete and asphalt for new works, while Spotters ensured adherence to No-Go Zones and overhead clearance protocols.
    • Bridge Installation: Our teams guided safe beam lifts, access control, and on-ground coordination for the new bridge structure.
    • Completion Works: Culverts, drainage entries, and safety barrier fixings were drilled and installed, followed by permanent line marking and final signage to complete the upgraded road layout.

    Every stage was supported by trained traffic controllers and safety personnel to maintain ongoing protection for workers and the public.

  • Collaboration

    Trafman Solutions worked closely with project engineers, survey teams, and construction crews, maintaining clear communication through daily briefings and ongoing coordination with site supervisors.

    Our teams adapted quickly to changing road conditions and construction requirements, providing real-time adjustments to traffic controls and service location plans.

    This collaborative approach ensured seamless workflow integration, proactive problem-solving, and alignment with project milestones from start to finish.

Expert Services We Delivered

Our Trafman Solutions Team in Action

Results

Delivering Safe, Efficient and Coordinated Traffic Solutions

Trafman Solutions played a critical role in ensuring the Lathams Road Upgrade progressed smoothly, safely, and on schedule. Through precise traffic management, accurate service identification, and seamless collaboration, the project delivered improved road capacity, reduced congestion, and safer travel conditions for the community.

Efficiency

Trafman Solutions’ integrated approach streamlined construction activities by enabling survey access, safe excavation, and controlled traffic flow throughout the project’s duration. Our coordinated traffic control and staged signage reduced delays, prevented unnecessary stoppages, and supported the timely completion of each project phase.

Safety

Safety was prioritised through the deployment of experienced Traffic Controllers, Spotters, and NDD teams who maintained strict compliance with No-Go Zones and asset protection protocols. Our controlled environments for surveyors, excavation crews, and bridge installation teams significantly reduced risk on a high-traffic arterial road.

Client Satisfaction

The project team benefited from reliable communication, responsive adjustments to evolving site conditions, and consistently high-quality work. Trafman Solutions’ ability to manage complex traffic shifts, utility exposures, and critical moments such as beam lifts contributed to a smooth construction process and high client confidence.

Community Benefit

The upgraded Lathams Road now delivers improved vehicle access, reduced congestion, and enhanced travel times for commercial transport and everyday commuters. Permanent line marking, clear signage, and safer intersections have created a more efficient and dependable route connecting Dandenong’s industrial hub to the Peninsula.

Testimonials

Trusted by Clients Across Australia

From local projects to large-scale infrastructure works, our clients share their experiences partnering with Trafman Solutions.

Move Your Project Safely and On Schedule

Accredited crews, proven processes, and a strong commitment to community impact.

GET IN TOUCH

Let’s Start the Conversation

Our team is ready to assist and provide the right solution for your needs. Share your message below and we’ll get back to you promptly.
Name(Required)